{"id":14385,"date":"2023-11-27T13:05:01","date_gmt":"2023-11-27T12:05:01","guid":{"rendered":"https:\/\/www.medov.it\/?p=14385"},"modified":"2025-12-18T14:38:15","modified_gmt":"2025-12-18T13:38:15","slug":"the-port-of-montreal-welcomes-the-government-of-canadas-support-for-its-contrecoeur-expansion-project","status":"publish","type":"post","link":"https:\/\/www.medov.it\/it\/2023\/11\/27\/the-port-of-montreal-welcomes-the-government-of-canadas-support-for-its-contrecoeur-expansion-project\/","title":{"rendered":"The Port of Montreal welcomes the Government of Canada&#8217;s support for its contrecoeur expansion project"},"content":{"rendered":"<p><strong>Montreal, October 10, 2023 \u2014<\/strong>\u00a0The MPA welcomes the $150 million allocated to the container terminal project in Contrec\u0153ur through the National Trade Corridors Fund (NTCF) announced today by Canada\u2019s Transport Minister, Pablo Rodriguez. This strategic investment is a giant step towards improving the fluidity of Canada\u2019s supply chain.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>A project for the future<\/strong><\/h3>\n<p>This financial support from the federal government confirms the strategic importance of the Contrec\u0153ur expansion project in view of the anticipated growth in the container sector to meet the needs of importers, exporters and consumers. In 2021, the Port of Montreal\u2019s expansion of its activities at Contrec\u0153ur received a favourable Decision Statement from Canada\u2019s Minister of the Environment and Climate Change, allowing the project to proceed.<\/p>\n<p>\u201cThis financial backing from the federal government sends a strong message about our large Contrec\u0153ur expansion project and the future of the logistics ecosystem in the St. Lawrence corridor. It lets us embark on the next steps with confidence, so that we can continue to play our vital role as a sustainable economic driver at the heart of the Quebec and Canadian economies,\u201d said Genevi\u00e8ve Deschamps, Interim President and Chief Executive Officer of the MPA.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>A hybrid approach<\/strong><\/h3>\n<p>This financial support announced today by federal Transport Minister Pablo Rodriguez will enable the MPA to implement a new delivery model for the major expansion project on Montreal\u2019s South Shore. Under the MPA\u2019s new approach, the MPA will be taking over some of the responsibilities for carrying out the project and cancels the current call for tenders to opt for a more agile approach. Work on the future terminal will be carried out in hybrid mode:<\/p>\n<ul>\n<li><strong>Marine works will be entirely carried out by the MPA.\u00a0<\/strong>The MPA will act as prime contractor for this phase, which includes dock construction and dredging work. Project planning will use a Design-Build approach (\u201cDB model\u201d) with a specialized firm assisting the MPA for the next 9 to 12 months. At the end of this phase, the MPA will assign the project works according to its procurement processes, and will present an updated schedule for this component of the project works.<\/li>\n<li><strong>Land site works and operations will be carried out with a private partner.\u00a0<\/strong>The MPA will issue a Request for Proposals in early 2024 to select a private partner to build the terminal (container yard, buildings, facilities and rail connection). This private partner will also operate and maintain the terminal under a DBFOM (Design-Build-Finance-Operate-Maintain). The water-based project works mentioned above are excluded from this component.<\/li>\n<\/ul>\n<p>As a result, the DBFOM procurement process launched in November 2021, which included both the terminal\u2019s construction work (marine and land site) and its operation, has been cancelled to make way for this new method to successfully carry out the project that is better suited to today\u2019s reality. Discussions with the bidders did not lead to a result deemed satisfactory by the MPA after factoring in market trends, including interest rates and inflation, between the time the Request for Qualifications began in 2021 to today.<\/p>\n<p>\u201cMPA teams are continuing their rigorous planning on the Port of Montreal\u2019s major Contrec\u0153ur expansion project that is so crucial to keeping supply chains resilient. The new procurement process put forward will enable us to control risks, project works and costs more effectively in the current context,\u201d said Genevi\u00e8ve Deschamps.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Montreal, October 10, 2023 \u2014\u00a0The MPA welcomes the $150 million allocated to the container terminal project in Contrec\u0153ur through the National Trade Corridors Fund (NTCF) announced today by Canada\u2019s Transport Minister, Pablo Rodriguez. This strategic  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":14389,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[653],"tags":[],"class_list":["post-14385","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"_links":{"self":[{"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/posts\/14385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/comments?post=14385"}],"version-history":[{"count":0,"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/posts\/14385\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/media\/14389"}],"wp:attachment":[{"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/media?parent=14385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/categories?post=14385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.medov.it\/it\/wp-json\/wp\/v2\/tags?post=14385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}